What are the provisions for the inspection and evaluation of crane hoisting
Category: Industry Dynamics
Release time:2023-04-26
What are the regulations on the inspection and evaluation of crane hoisting?
1, lifting
1) When multiple cranes lift a member at the same time, the load borne by a single crane should meet the requirements of the special construction scheme;
2) The hanging point of the sling shall meet the requirements of the special construction scheme;
3) During crane operation, no one should stay under the boom, and the object to be lifted should not pass directly above the person;
4) Cranes should not be used to carry personnel;
5) When lifting easily scattered objects, special lifting cage should be used.
2, high work1) High working platform should be set up according to the regulations;
2) Platform strength and guardrail height shall meet the requirements of the code;
3) The strength and structure of the ladder should meet the requirements of the code;
4) Reliable seat belt suspension points should be set up, and high hanging low use.
3, component layout
1) The loading of the member shall be within the allowable range of the bearing capacity of the working surface;
2) The height of the component shall be within the allowable range;
3) The placement of large components should take measures to ensure stability.
4. Vigilance and monitoring1) The operation warning area should be set up according to the regulations;
2) Special person should be assigned to guard the warning area.
keyword: What are the provisions for the inspection and evaluation of crane hoisting