What are the regulations for inspection and evaluation of crane lifting operations?
Category: Industry News
Release time:2020-02-13
What are the regulations for inspection and evaluation of crane lifting operations?
1 , Lifting and Rigging
1) When multiple cranes lift a single component simultaneously, the load borne by each crane must comply with the requirements specified in the specialized construction plan. ;
2) The lifting sling attachment points must comply with the requirements of the specific construction plan. ;
3) When operating a crane, no one should stand beneath the boom, and lifted objects must not pass directly above people. ;
4) Cranes should not be used to transport personnel with lifting attachments. ;
5) When lifting items that are prone to scattering, a dedicated lifting cage should be used.
2 • Work at heights
1) High-altitude work platforms should be set up as required. ;
2) Platform strength and guardrail height must meet regulatory requirements. ;
3) The strength and construction of the ladder must meet regulatory requirements. ;
4) A reliable safety harness attachment point should be provided, and the harness should be used with the anchor high and the user positioned lower.
3 , Component Stacking
1) The load for component stacking must be within the allowable capacity of the working surface. ;
2) The stacking height of components must be within the specified allowable range. ;
3) Large components should have measures in place to ensure stability during storage.
4 • Surveillance and Monitoring
1) Work warning zones should be set up as required. ;
2) A dedicated person should be assigned to monitor the alert zone.