What are the regulations for inspection and evaluation of crane lifting operations?

Release time:2020-02-13

What are the regulations for inspection and evaluation of crane lifting operations?

1 , Lifting and Rigging

1) When multiple cranes lift a single component simultaneously, the load borne by each crane must comply with the requirements specified in the specialized construction plan. ;

2) The lifting sling attachment points must comply with the requirements of the specific construction plan. ;

3) When operating a crane, no one should stand beneath the boom, and lifted objects must not pass directly above people. ;

4) Cranes should not be used to transport personnel with lifting attachments. ;

5) When lifting items that are prone to scattering, a dedicated lifting cage should be used.

2 • Work at heights

1) High-altitude work platforms should be set up as required. ;

2) Platform strength and guardrail height must meet regulatory requirements. ;

3) The strength and construction of the ladder must meet regulatory requirements. ;

4) A reliable safety harness attachment point should be provided, and the harness should be used with the anchor high and the user positioned lower.

3 , Component Stacking

1) The load for component stacking must be within the allowable capacity of the working surface. ;

2) The stacking height of components must be within the specified allowable range. ;

3) Large components should have measures in place to ensure stability during storage.

4 • Surveillance and Monitoring

1) Work warning zones should be set up as required. ;

2) A dedicated person should be assigned to monitor the alert zone.

Keywords: What are the regulations for inspection and evaluation of crane lifting operations?

Related News

Product Inquiry

Please fill in the question you’d like to consult about, and we’ll provide you with the appropriate product support based on your needs!